Free tool · Nigeria

Concrete Calculator

Estimate concrete volume and material quantities before you cast slabs, blinding, or mass fill. This calculator uses common Nigerian mix ratios (1:2:4, 1:3:6, 1:1.5:3) and applies wastage so you can order cement, sand, and granite with confidence.

Concrete Calculator

Estimate volume, materials, and cost for concrete casting.

Calculation Results
Plan Area:0.00 m²
Net Volume:0.000 m³
Volume (with wastage):0.000 m³
Cement Required:0 bags
Sand Required:0.0 tons
Granite Required:0.0 tons
Cement Cost:₦0
Sand Cost:₦0
Granite Cost:₦0
Total Cost:₦0

Save this estimate to your project

Create a free RazorBuilder account to store quantities, build a BOQ, and track materials on site.

Save to dashboard

Assumptions

  • Mix ratios follow site practice for general structural work — confirm with your structural engineer on critical elements.
  • Default wastage allowance is included; increase it for pump lines, uneven subgrade, or spillage-heavy pours.
  • Bag counts are rounded up to whole 50 kg cement bags.

Worked example

A 3.6 m × 3.6 m slab at 150 mm thickness is about 1.94 m³ before wastage. At 1:2:4 with 5% wastage you would allow roughly 12 bags of cement plus sand and granite as shown in the results.

Related resources

Need this on every job?

RazorBuilder stores calculator outputs in your project, turns quantities into BOQ lines, and tracks materials on site — so you are not re-typing the same wall or slab every week.